From: route@monster.com
Sent: Tuesday, April 12, 2016 11:30 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Christopher Bunnpage 1 CHRISTOPHER BUNN 1105
Gloria Lane ¨ Yardley, PA 19067 H
(215) 428-0430 ¨ cell (215) 964-8903 ¨ cbunn149@yahoo.com ___________________________________________________________________________________________ PROFESSIONAL EXPERIENCE: Chilton Engineering, cherry Hill NJ Senior Engineering Technician
Nov. 1st- present I’m
currently completing an InRoads project, creating DTMs, break lines and
contours for a preliminary bridge project in Buck County PA. I’m also setting
up an ITS project for the NYCDOT. The project entails 6 ITS signs along the
belt parkway in Queens and Brooklyn. This project is being done in Autocad
2014. (this project has been put on hold) Act
Engineers Inc, Robbinsville NJ Sept. 13th-
Dec 5th 2013 Rowbear
Consulting – Red Bank NJ AutoCad/Microstation Cad Drafter: I worked in a dual role
for both Act Engineers and Rowbear consulting out of the same office. For Act
Engineers I worked assisting in Autocadd civil 3d creating plans for various
projects. I also created an Autocadd to Microstation CVS file for their CAD
conversion needs. For Rowbear Consulting
I updated environmental files for NJDOT’s RT280/RT 21 interchange project. Orbital
Engineering – Bensalem PAMay 8th – June 14th
2013 Electrical Microstation Cad Drafter: I worked as part of a
two person team to update 170 relined files for PSE&G. The project was
done ahead of schedule and met the client’s satisfaction. Maser
Consulting – Hamilton NJMay 2012 – September 2012 Survey CAD Technician: I converted raw survey data and existing GIS
information into useable base maps for PSE&G project spanning from
Athenia Switching Station to the Bergen Switching Station in Northern New
Jersey. I used Etac maps to create parcel plans for the project. Another part
of my job included creating 3-D utility files. I also convert the files from
Autocad 2009 civil 3d LDD files into the finished product in Microstation
v8i. Numerous line style modifications were needed, the shifting of the
reference files were made to make the final product meet the client
specifications. I have project management training along with knowledge of
(M.A.G.I.C) customer relation skills. Orth-Rodgers & Associates -, West Trenton, NJ:August
2006 to Oct 2010 DESIGNER I Responsibilities
included generating geometric designs for intersections, creating horizontal
and vertical alignments and cross sections using InRoads. Other tasks also
include creating traffic signing and pavement marking plans as well as
construction staging and maintenance and protection of traffic plans using
Microstation V8 and AUTOCADD civil 3d 2009. Utilizing Arc-View as well as
other GIS related software/websites to find information such as wetlands,
hazardous material/superfund sites and historical resources. Incorporating
engineers marked up electrical and signal plans in accordance with
NJDOT/PennDOT CADD standards. Experience also includes using visual lighting
software to achieve lighting uniformity for streetscape lighting. Clients/Projects: Earle
Naval Weapons Station: ·
Earle Lauralwood Housing Access to RT 34 Colts Neck
Township. Wal-Mart
Corporation: ·
Intersection upgrades for 4 new Wal-Mart sites City of Philadelphia/PennDOT: ·
4 Streetscape projects. NJDOT: ·
Various intersection/highway improvement projects for
Ocean, Cape May, Monmouth, Ewing and Burlington Counties in NJ: PennDOT
district 1-0 ·
Erie Bay front streetscapes
project
KCI Technologies, Bensalem, PA
CAD Drafter August 1997 – August 2006 Responsibilities include: maintaining
the office’s CADD/IT system; drafting, updating and plotting related maps and
graphics using Microstation V8; creating traffic signal plans, pavement
marking plans, detour routes, typical roadway sections, cross sections and
profiles. Use of Arc-View and other GIS software to find wetland locations;
calculating impacts for wetlands and stream impacts; collecting natural
resource and hazardous waste site information for various proposals and
projects; collecting right-of-way and tax parcel information for specific
project plans in accordance with PennDOT CADD standards. Other
responsibilities include monitoring traffic activities for various projects
to construct electronic models of traffic patterns. Clients/Projects: Pennsylvania
Turnpike Commission: ·
EIS and FEIS for the I-95/I-276 Interchange Project –
Bensalem, Middletown and Bristol Townships. PennDOT
District 6-0: ·
Various PennDOT related projects. SEPTA: ·
Cross-County Metro Corridor, Light Rail Study from
Thorndale Township, Chester County to Morrisville Borough, Bucks County. City
of Philadelphia: SR
2009 Harbison Ave. / Aramingo Ave. 26, Intersection Improvement Project;
Bells Mill Road Improvement Project. Site Models, Woodbury, NJ CAD drafter June 1996 – August 1997 Responsibilities include: utilizing
Microstation V7 and VEXCEL 3-D photogrammetric systems to create accurate
3-dimensional models in PDMS for clients. Other responsibilities
included performing site visits for field measurement to verify the accuracy
during the modeling process. Clients/Projects: Merck
Pharmaceuticals, Whitehouse Station, NJ Campus: ·
Created 3-D models to determine the feasibility of
installing new equipment. PSE&G: ·
Created highly accurate site models to assist PSE&G
with the replacement of a 126’ steam generator at the Salem 1 nuclear power
plant. The model was created to be within 1” for building steel surrounding
the generator unit and within 1/4” for all piping. Models included all
equipment, piping larger than 1”, valves, flanges and cable trays. Jacobs Segal Triad, Narberth, PA
CAD drafter August 1995 – June 1996 Responsibilities
include: using AutoCAD 12 software and Microstation V5 to incorporate
engineer’s mark-ups for various clients including Friends Hospital and Merck
Pharmaceuticals for the installation for piping/plumbing systems for drainage
and laboratory sinks and water supply. Cataract, Inc., Newtown, PA CAD drafter November 1992 – August 1995 Responsibilities include: incorporating
as-built drawings using Microstation V5 and IRAS-B software. Clients/Projects: PECO: Limerick
and Peach Bottom Nuclear Power Plants. ·
Responsible for incorporating field markups (as-builts)
for PECO’s two nuclear power stations as well as performing field
verifications for their gas process/distribution plant COMPUTER SKILLS: Proficient in: MicrostationV8I, AUTOCADD 2009.
Working knowledge in, civil LDD,Inroads, Microsoft Office Suite, GIS Mapping
,VEXCEL and 3-D photogrammetric programs, IRAS-B, PDMS EDUCATION: Davenport University of Business, Grand Rapids, MI Bucks County Community College, Business Management INTERESTS & AFFILIATIONS Life Member of the Yardley-Makefield Volunteer Fire
Company, (1982 – Present) Leadership positions: ·
Assistant Chief: Oversaw daily operation of fire station;
implemented and oversaw training exercises; mentoring junior firefighters and
new recruits; ensured that all safety protocols and policies were implemented
and followed; Oversaw fire safety during a Presidential visit to Lower
Makefield Township in 2004 and worked with various members of the U.S. Secret
Service, PA state and local police for several weeks to ensure to safe
arrival and departure of the President of the United States. ·
I was on the plan review committee to review any new
developments and commercial buildings to ensure they met local and state
codes. ·
Trustee: responsible for oversight of entire fire company;
adherence to rules, regulations and policies implemented by department were
carried out; investigated any complaints or violations and brought to
resolution; ·
Trustee for Relief Association: ensured strict adherence
to the PA State purchasing guidelines; responsible for financial records of
Relief Association; purchase and disposal of certain equipment covered under
State guidelines; oversaw 7 million dollars of relief money; ·
New Fire truck committee: responsible for purchasing
approximately 2 million dollars worth of equipment; spec out new fire trucks
and seek approval from township for purchase; visits to truck manufacturing
plant at different intervals during the assembly of the truck ·
Drivers Training Committee: responsible for training new
drivers and gage their proficiency on different apparatus; maintaining
records of all drivers and their qualifications. ·
Planning committee for new office complexes and housing
developments Yardley-Makefield Emergency Unit (1984-1990) Served as an EMT on Emergency related
calls PRIOR SECURITY CLEARANCES/BACKGROUND CHECKS; FBI background check for unescorted
access to St. Lucie Nuclear power plant U.S. Secret service background check for
presidential visit in 2004 REFERENCES:
Professional: Joseph F. (Jay) Roth
III, P.E. Senior Program Manager
/ JACOBS NA
Infrastructure – East Trevose, PA 19053 215-355-3577 Office Marshall Robert Rowbear Consulting,
P.C. Phone 609-571-8381 MRobert@rowbertconsulting.com Kristin M. Norwood,
P.E. Senior
transportation engineer Gilmore&
Associates, Inc Personal: Robert
J. Snyder, P.L.S. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|